Extensive Remodel of an Existing Wendy’s Restaurant
Client Background & Challenge
This project involved a major renovation of an existing Wendy’s location. We worked closely with the design and engineering teams to address constructability issues and implement cost-effective solutions.
The client sought to extensively remodel an existing Wendy’s in Delaware, Ohio. The challenge was to identify and resolve constructability issues while maintaining cost efficiency and adhering to the project timeline.
Our Solution
Design Collaboration
Worked closely with the design team to identify and resolve constructability issues in the initial plans.
Structural Reconfiguration
Assisted in redesigning and reconfiguring structural components to ensure optimal constructability.
On-Site Engineering Collaboration
Met with the engineering team on-site to develop a rapid and effective solution.
Cost-Effective Execution
Ensured a budget-conscious approach that benefited both the general contractor and their client.
Additional Challenges & Solutions
Solution
Collaborated with the design team to identify and implement practical modifications.
Solution
Worked directly with the engineering team to develop and integrate an effective redesign.
Results & Key Benefits
Optimized Constructability
Assisted in refining the design to ensure structural integrity and ease of execution.
Budget-Conscious Solutions
Helped control costs by providing value-engineered alternatives during the design phase.
Seamless Project Coordination
Finished in less than half the time corporate typically allocates.
Accelerated Problem-Solving
Our proactive approach allowed for quick identification and resolution of design challenges, preventing delays and keeping the project moving forward efficiently.
See More of our Work
Browse through Additional success stories, below